Gümüş 4 apartment
August 15, 2020Life Residence 2 ,flat
July 15, 2020Markazi - Arak - Sanjan
Residential complex
Bonyad - e - Maskan
Tunnel Formwork System
ONE of the methods used to construct buildings with a load bearing system is a concrete wall and roof. The name of the tunnel is due to the metallic form of the walls and ceilings. In the tunnel system, concrete walls and ceilings are reinforced, molded, and reinforced simultaneously. This method, while improving the speed and quality of execution, significantly improves the structural performance and seismic behavior of the structural set in terms of the integrity of their members and their connections.About project
The Housing Foundation of the Islamic Revolution of Iran is constructing a residential town in the west of Arak city in Sanjan region. At the time of submitting the work to this consultant, the site of the town and some of its residential projects were designed and implemented. Naghsh Afrin Mehraaz Consulting Engineers has designed in the painted parts according to the plan site, which includes the following:
1000
units
in 12 blocks of 11 floors.
708
units
including 5 blocks of 52 units and 7 blocks of 64 units.
660
units
Includes parking and facade design and interior architecture.
Kosar Residential complex, 1000 units
Design of the first and second phases of the 1050-unit project in 12 blocks. Each block consists of 11 floors of 4 and 6 units.
location | Markazi, Sanjan Arak |
---|---|
Category | Residential |
Status | Under construction |
Structure | Tunnel formwork system |
Systems | Heating package, Evaporative cooler |
VIEW OTHER
Project images
Kosar Residential complex, 708 units (MAHYA)
Design of the first and second phases of the 708-unit residential complex in 5 blocks of 52 units and 7 blocks of 64 units.
location | Markazi, Sanjan Arak |
---|---|
Category | Residential |
Status | Completed |
Structure | Tunnel formwork system |
Systems | Heating package, Evaporative cooler |
VIEW OTHER
Project images
Kosar Residential complex, 660 units
Due to the fact that the skeleton of the 660-unit project was designed and executed with a tunnel formwork system without parking, the parking lot design, interior architecture and project facade were done by this consultant.
location | Markazi, Sanjan Arak |
---|---|
Category | Residential |
Status | Under construction |
Structure | Tunnel formwork system |
Systems | Heating package, Evaporative cooler |